Feasibility analysis of changing turbine load in power plants using continuous condenser pressure adjustment
Year of publication: |
2014
|
---|---|
Authors: | Wang, Wei ; Zeng, Deliang ; Liu, Jizhen ; Niu, Yuguang ; Cui, Can |
Published in: |
Energy. - Elsevier, ISSN 0360-5442. - Vol. 64.2014, C, p. 533-540
|
Publisher: |
Elsevier |
Subject: | Condenser pressure | Load change | Variable speed pump | Coal-fired power plants | Coal consumption rate |
-
Lin, Boqiang, (2015)
-
Accelerating coal plant retirement at scale
Chattopadhyay, Deb, (2023)
-
Estimating Indirect Benefits: Fracking, Coal and Air Pollution
Johnsen, Reid, (2016)
- More ...
-
Variable-speed technology used in power plants for better plant economics and grid stability
Wang, Wei, (2012)
-
Lv, You, (2013)
-
Consensus of heterogeneous multi-agent systems with switching jointly-connected interconnection
Mo, Lipo, (2015)
- More ...