Flexible job-shop scheduling problem with resource recovery constraints
Year of publication: |
1-15 May 2018
|
---|---|
Authors: | Devassia, Jobish Vallikavungal ; Salazar-Aguilar, M. Angélica ; Boyer, Vincent |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 9 (1/15.5.), p. 3326-3343
|
Subject: | flexible job-shop scheduling problem | resource constraints | resource recovery | variable neighbourhood search | makespan | Scheduling-Verfahren | Scheduling problem | Flexibles Fertigungssystem | Flexible manufacturing system | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Sun, Jinghe, (2021)
-
Corominas, Albert, (2019)
-
Wang, Shengyao, (2013)
- More ...
-
A matheuristic based on Lagrangian relaxation for the multi-activity shift scheduling problem
Hernández-Leandro, Noberto A., (2019)
-
Multi-depot periodic vehicle routing problem with due dates and time windows
Cantu-Funes, Roberto, (2018)
-
The scale force sizing problem with multi-period workload assignments, and service time windows
Salazar-Aguilar, M. Angélica, (2019)
- More ...