Flexible job shop scheduling with due window—a two-pheromone ant colony approach
Year of publication: |
2013
|
---|---|
Authors: | Huang, Rong-Hwa ; Yang, Chang-Lin ; Cheng, Wei-Che |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 141.2013, 2, p. 685-697
|
Publisher: |
Elsevier |
Subject: | Flexible job shop scheduling | Parallel machine | Time window | Ant colony optimization | Two-pheromone ant colony optimization |
-
Flexible job shop scheduling with due window : a two-pheromone ant colony approach
Huang, Rong-hwa, (2013)
-
Multi-population interactive coevolutionary algorithm for flexible job shop scheduling problems
Xing, Li-Ning, (2011)
-
Scheduling to minimize the maximum total completion time per machine
Wan, Long, (2015)
- More ...
-
Flexible job shop scheduling with due window—a two-pheromone ant colony approach
Huang, Rong-Hwa, (2013)
-
Flexible job shop scheduling with due window : a two-pheromone ant colony approach
Huang, Rong-hwa, (2013)
-
Integration of corporate social responsibility into new product development
Yang, Chang-Lin, (2016)
- More ...