//-->
Cyclic Scheduling in Flow Lines: Modeling Observations, Effective Heuristics and a Cycle Time Minimization Procedure
Karabati, S., (1996)
The Permutation Flow Shop Problem with Sum-of-Completion Times Performance Criterion
Karabati, S., (1993)
Cyclic Scheduling in Synchronous Production Lines.
Kouvelis, P., (1997)