Flowshop sequence-denpendent group scheduling with minimisation of weighted earliness and tardiness
Year of publication: |
2019
|
---|---|
Authors: | Keshavarz, Taha ; Salmasi, Nasser ; Varmazyar, Mohsen |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 13.2019, 1, p. 54-80
|
Subject: | earliness | tardiness | sequence-dependent setup time | group scheduling | Dantzig-Wolf decomposition | particle swarm optimisation | PSO | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Algorithmus | Algorithm | Evolutionärer Algorithmus | Evolutionary algorithm |
-
Liou, Cheng-Dar, (2015)
-
Hosseinzadeh, Mohammad Reza, (2022)
-
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times
Kim, Jun, (2021)
- More ...
-
Keshavarz, Taha, (2015)
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
-
Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem
Keshavarz, Taha, (2013)
- More ...