Fuzzy procurement selection model for construction projects
Recent developments in procurement selection systems are reviewed and this reveals contradiction and conflict with previous work. A mathematical rank model called fuzzy procurement selection model (FPSM) is proposed to adapt to local circumstances. FPSM can be modified according to local conditions or requirements and the modification methods are well documented in previous work. The proposed model overcomes the continual arguments on establishing a set of universal criteria on procurement selection systems and provides a useful tool to cope with different project/client's requirements.
Year of publication: |
2007
|
---|---|
Authors: | Chan, Caroline T. W. |
Published in: |
Construction Management and Economics. - Taylor & Francis Journals, ISSN 0144-6193. - Vol. 25.2007, 6, p. 611-618
|
Publisher: |
Taylor & Francis Journals |
Subject: | Procurement | selection criteria | fuzzy logic |
Saved in:
Online Resource
Saved in favorites
Similar items by subject
-
Decision support system for evaluation and ranking of robots using hybrid approach
Garg, Ramesh Kumar, (2023)
-
Tsaur, Sheng-hshiung, (2014)
-
Selecting suitable procurement system for steel building construction
Perera, G.P.P.S., (2020)
- More ...