//-->
Branch and bound crossed with GA to solve hybrid flowshops
Portmann, M.-C., (1998)
Project management and scheduling
Oulamara, A., (2008)
Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times
Fondrevelle, J., (2008)