//-->
On makespan improvement in flow shops with multiple processors
Santos, D.L., (2001)
An evaluation of sequencing heuristics in flow shops with multiple processors
Santos, D.L., (1996)
A multiple-pass heuristic rule for job shop scheduling with due dates.
He, Z., (1993)