//-->
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
Park, M.-W., (2000)
A heuristic for setting up a flexible assembly system
Park, M.-W., (1995)
A due date-based approach to part type selection in flexible manufacturing systems
Kim, Y.-D., (1994)