GRASP and path relinking for project scheduling under partially renewable resources
Recently, in the field of project scheduling problems the concept of partially renewable resources has been introduced. Theoretically, it is a generalization of both renewable and non-renewable resources. From an applied point of view, partially renewable resources allow us to model a large variety of situations that do not fit into classical models, but can be found in real problems in timetabling and labor scheduling. In this paper, we develop some preprocessing techniques and several heuristic algorithms for the problem. Preprocessing significantly reduces the dimension of the problems, therefore improving the efficiency of solution procedures. Heuristic algorithms based on GRASP and Path relinking are then developed and tested on existing test instances, obtaining excellent results.
Year of publication: |
2008
|
---|---|
Authors: | Alvarez-Valdes, R. ; Crespo, E. ; Tamarit, J.M. ; Villa, F. |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 189.2008, 3, p. 1153-1170
|
Publisher: |
Elsevier |
Saved in:
Saved in favorites
Similar items by person
-
A scatter search algorithm for project scheduling under partially renewable resources
Alvarez-Valdes, R., (2006)
-
GRASP and path relinking for project scheduling under partially renewable resources
Alvarez-Valdes, R., (2008)
-
Case-oriented Papers - Labour scheduling at an airport refuelling installation
Alvarez-Valdes, R., (1999)
- More ...