//-->
MIP models for minimizing total tardiness in a two-machine flow shop
Kharbeche, M., (2013)
A generic environment for modelling future launch operations—GEM-FLO: a success story in generic modelling
Kaylani, A., (2008)
Scheduling setup changes at bottleneck workstations in semiconductor manufacturing
Duwayri, Z., (2006)