Heuristics for minimizing tool switches when scheduling part types on a flexible machine
Year of publication: |
1998
|
---|---|
Authors: | Hertz, A. ; Laporte, G. ; Mittaz, M. ; Stecke, K.E. |
Published in: |
IIE transactions / Institute of Industrial Engineers, Norcross, Ga : industrial engineering and development. - Philadelphia, Pa : Taylor & Francis, ISSN 0569-5554, ZDB-ID 2460191. - Vol. 30.1998, 8, p. 689-694
|
Saved in:
Saved in favorites
Similar items by person
-
A tabu search heuristic for the vehicle routing problem
Gendreau, Michel, (1994)
-
Smith, T.M., (1996)
-
Production planning for flexible flow systems with limited machine flexibility
Lee, H.F., (1998)
- More ...