Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem
Year of publication: |
2020
|
---|---|
Authors: | Shi, Fei ; Zhao, Shikui ; Meng, Yue |
Subject: | adjacency matrix | assembly job shop | extended disjunctive graph | hybrid genetic algorithm | operation constraint chain | shifting bottleneck procedure | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm | Engpass | Bottleneck | Fließfertigung | Assembly-line production | Algorithmus | Algorithm | Graphentheorie | Graph theory | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Sun, Jinghe, (2024)
-
Assembly sequence planning based on a hybrid particle swarm optimisation and gentic algorithm
Xing, Yanfeng, (2012)
-
Lau, Haili, (2016)
- More ...
-
Analysis of the effect of industrial transformation of resource-based cities in Northeast China
Hou, Gaolan, (2019)
-
Meng, Yue, (2021)
-
Optimal models for sustainable supply chain finance : evidence from electric vehicle industry
Ma, Peng, (2023)
- More ...