//-->
Hybrid artificial neural network and statistical model for forecasting project total duration in earned value management
Li, You, (2012)
An integrated release and dispatch policy for semiconductor wafer fabrication
Li, You, (2014)
Closed loop control-based real-time dispatching heuristic on parallel batch machines with incompatible job families and dynamic arrivals
Jia, Wenyou, (2013)