Hybrid two stage flowshop scheduling with secondary resources based on time buckets
Year of publication: |
2022
|
---|---|
Authors: | Ruiz-Torres, Alex J. ; Paletta, Giuseppe ; Adenso-Díaz, Belarmino |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 60.2022, 6, p. 1954-1972
|
Subject: | due-date scheduling | Flow shop scheduling | hybrid production systems | reconfigurable manufacturing systems | worker assignment | Scheduling-Verfahren | Scheduling problem | Produktionssystem | Manufacturing system | Durchlaufzeit | Lead time | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Algorithmus | Algorithm |
-
Fuzzy-metaheuristic methods to solve a hybrid flow shop scheduling problem with pre-assignment
Yalaoui, Naim, (2013)
-
Rakrouki, Mohamed Ali, (2012)
-
Minimizing the total completion time in a distributed two stage assembly system with setup times
Xiong, Fuli, (2014)
- More ...
-
Scheduling to maximise worker satisfaction and on-time orders
Ruiz-Torres, Alex J., (2015)
-
Makespan minimisation with sequence-dependent machine deterioration and maintenance events
Ruiz-Torres, Alex J., (2017)
-
Massabo, Ivar, (2016)
- More ...