Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job
Year of publication: |
2020
|
---|---|
Authors: | Wang, Shijin ; Wu, Ruochen ; Chu, Feng ; Yu, Jianbo |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 118.2020, p. 1-17
|
Subject: | Emergency job | Identical parallel machine scheduling | Makespan | Maximum waiting time | Total completion time | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Warteschlangentheorie | Queueing theory | Algorithmus | Algorithm | Branch-and-Bound | Branch and Bound | Produktionssteuerung | Production control |
-
Joo, B.-J., (2009)
-
On the exact bounds of SPT for scheduling on parallel machines with availability constraints
Tan, Zhiyi, (2013)
-
Three-machine flow shop scheduling with overlapping waiting time constraints
Kim, Hyun-Jung, (2019)
- More ...
-
Unrelated parallel machine scheduling problem with special controllable processing times and setups
Wang, Shijin, (2022)
-
The interval min-max regret knapsack packing-delivery problem
Wang, Shijin, (2021)
-
An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production
Wang, Shijin, (2020)
- More ...