//-->
Multi-facilities tactical planning robustness with experimental design
Genin, P., (2008)
The two level master production schedule and planning bills in a just in time MRP context
Lamouri, S., (2000)
Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
Allaoui, H., (2008)