Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties
Year of publication: |
2010
|
---|---|
Authors: | Valente, Jorge M.S. ; Schaller, Jeffrey E. |
Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 4.2010, 1, p. 99-129
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | heuristics | single machine scheduling | linear earliness | quadratic tardiness | dispatching rules | genetic algorithms | idle time | backward scheduling | industrial engineering |
-
Valente, Jorge M. S., (2008)
-
VALENTE, JORGE M. S., (2009)
-
Valente, Jorge M. S., (2007)
- More ...
-
A mathematical approach for integrating the cell design and production planning decisions
Schaller, Jeffrey E., (2000)
-
Scheduling a flowline manufacturing cell with sequence dependent family setup times
Schaller, Jeffrey E., (2000)
-
Single machine scheduling with family setups to minimize total earliness and tardiness
Schaller, Jeffrey E., (2008)
- More ...