Including rest allowance in mixed-model assembly lines
Year of publication: |
2021
|
---|---|
Authors: | Finco, Serena ; Calzavara, Martina ; Sgarbossa, Fabio ; Zennaro, Ilenia |
Subject: | ageing | case study | human factor | mathematical model | Mixed-model assembly line | recovery time | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem |
-
Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers
Hashemi-Petroodi, S. Ehsan, (2022)
-
Minimising utility work and utility worker transfers for a mixed-model assembly line
Cevikcan, Emre, (2011)
-
Simultaneous solving of balancing and sequencing problems in mixed-model assembly line systems
Mosadegh, Hadi, (2012)
- More ...
-
Calzavara, Martina, (2025)
-
A cost-based tool for the comparison of different e-grocery supply chain strategies
Calzavara, Martina, (2023)
-
Age replacement policy in the case of no data : the effect of Weibull parameter estimation
Sgarbossa, Fabio, (2020)
- More ...