Input control in a batch production system with lead times, due dates and random yields
Year of publication: |
2000
|
---|---|
Authors: | Wang, Yunzeng ; Gerchak, Yigal |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 2430034. - Vol. 126.2000, 2, p. 371-385
|
Saved in:
Saved in favorites
Similar items by person
-
Continuous review inventory control when capacity is variable
Wang, Yunzeng, (1996)
-
Lot Sizing in Assembly Systems With Random Component Yields
Gerchak, Yigal, (1994)
-
Capacity games in assembly systems with uncertain demand
Wang, Yunzeng, (2003)
- More ...