Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates
Year of publication: |
2003
|
---|---|
Authors: | Zozom Jr, A. ; Hodgson, T.J. ; King, R.E. ; Weintraub, A.J. ; Cormier, D. |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 41.2003, 1, p. 31-46
|
Saved in:
Saved in favorites
Similar items by person
-
Dynamic lot size-sequencing policies in a multi-product, single-machine system
Hodgson, T.J., (1997)
-
Minimizing L max for the single machine scheduling problem with family set-ups
Schultz, S.R., (2004)
-
Minimizing L max for large-scale, job-shop scheduling problems
Schultz, S.R., (2004)
- More ...