Integrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint
Year of publication: |
2013
|
---|---|
Authors: | Lu, Zhiqiang ; Zhang, Yuejun ; Han, Xiaole |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 5 (1.3.), p. 1379-1391
|
Subject: | capacitated lot sizing problem | reliability | run-based PM | Losgröße | Lot size | Instandhaltung | Maintenance policy | Theorie | Theory | Produktionssteuerung | Production control | Produktionskapazität | Production capacity | Dynamische Optimierung | Dynamic programming |
-
Capacitated lot sizing problem with periodic carbon emission constraints and multiple resources
Kocak, Esra, (2023)
-
Analysis of a dynamic lot-sizing problem with production capacity constraint
Zhang, Zhicong, (2016)
-
Capacitated lot-sizing problem with outsourcing
Zhang, Minjiao, (2015)
- More ...
-
Lu, Zhiqiang, (2013)
-
A dynamic method for the production lot sizing with machine failures
Zhang, Yuejun, (2014)
-
A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
Lu, Zhiqiang, (2012)
- More ...