//-->
JIT production planning approach with fuzzy due date for OKP manufacturing systems
Wang, Wei, (1998)
A branch and bound algorithm for sub-contractor selection in agile manufacturing environment
Ip, W.H., (2004)
Simulation study of CONWIP for a cold rolling plant
Huang, Min, (1998)