Job rotation in assembly lines employing disabled workers
In this paper we consider the programming of job rotation in the assembly line worker assignment and balancing problem. The motivation for this study comes from the designing of assembly lines in sheltered work centers for the disabled, where workers have different task execution times. In this context, the well-known training aspects associated with job rotation are particularly desired. We propose a metric along with a mixed integer linear model and a heuristic decomposition method to solve this new job rotation problem. Computational results show the efficacy of the proposed heuristics.
Year of publication: |
2009
|
---|---|
Authors: | Costa, Alysson M. ; Miralles, Cristóbal |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 120.2009, 2, p. 625-632
|
Publisher: |
Elsevier |
Keywords: | Assembly lines Disabled workers Job rotation |
Saved in:
Saved in favorites
Similar items by person
-
Two extensions for the ALWABP: Parallel stations and collaborative approach
Araújo, Felipe F.B., (2012)
-
Two extensions for the ALWABP: Parallel stations and collaborative approach
Araújo, Felipe F.B., (2012)
-
Job rotation in assembly lines employing disabled workers
Costa, Alysson M., (2009)
- More ...