Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems
M. Assid, A. Gharbi and A. Hajji
Year of publication: |
2015
|
---|---|
Authors: | Assid, M. ; Gharbi, A. ; Hajji, A. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 53.2015, 15 (1.8.), p. 4668-4683
|
Subject: | production/setup control | preventive maintenance | inflexible and unreliable manufacturing system | simulation modelling | response surface methodology | Instandhaltung | Maintenance policy | Produktionssystem | Manufacturing system | Simulation | Theorie | Theory | Kuppelproduktion | Joint production | Produktion | Production | Produktionssteuerung | Production control |
Saved in: