//-->
MIP-based fix-and-optimise algorithms for the parallel machine capacitated lot-sizing and scheduling problem
Xiao, Jing, (2013)
A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times
Stecco, Gabriella, (2008)
Dynamic order acceptance and scheduling problem with sequence-dependent setup time
Xu, Lei, (2015)