//-->
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems
Kim, Yeong-Dae, (2001)
Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop
Lee, Dong-Ho, (1996)