Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
Year of publication: |
2003
|
---|---|
Authors: | Teunter, Ruud H. ; Flapper, Simme Douwe P. |
Published in: |
OR spectrum : quantitative approaches in management. - Berlin : Springer, ISSN 0171-6468, ZDB-ID 2073885-7. - Vol. 25.2003, 1, p. 85-96
|
Subject: | Losgröße | Lot size | Produktionsplanung | Production planning | Theorie | Theory |
-
Setting optimal production lot sizes and planned lead times in a job shop
Yuan, Rong, (2016)
-
Islam, S. M. Shahidul, (2019)
-
Effect of rework, rejects and inspection on lot size with work-in-process inventory
Ullah, Misbah, (2014)
- More ...
-
Logistic planning of rework with deteriorating work-in-process
Flapper, Simme Douwe P., (2004)
-
Optimal core acquisition and remanufacturing policies under uncertain core quality fractions
Teunter, Ruud H., (2011)
-
Rework and postponement : a comparison of bottling strategies
Teunter, Ruud H., (2003)
- More ...