Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks
Year of publication: |
2014
|
---|---|
Authors: | Chakraborty, T. ; Giri, B. C. |
Subject: | Inventory | Production | Inspection | Preventive maintenance | Rework | Instandhaltung | Maintenance policy | Losgröße | Lot size | Produktionssystem | Manufacturing system | Theorie | Theory | Lagerhaltungsmodell | Inventory model | Produktionssteuerung | Production control |
-
Optimization of preventive maintenance schedule and production lot size
Suliman, Saad M. A., (2012)
-
Bouslah, Bassem, (2016)
-
Liu, Xuejuan, (2017)
- More ...
-
Development of Tourism Industry in Bangladesh
Shamsuddoha, Mohammad, (2009)
-
Saha, Sarani, (2022)
-
Chakraborty, Tanika, (2022)
- More ...