//-->
Machine scheduling with job delivery coordination
Chang, Yung-Chia, (2004)
Integrating TOPSIS and DEMATEL Methods to Rank the Risk of Failure of FMEA
Chang, Kuei-Hu, (2014)
Prioritizing 5S activities by Kano model with modified CS coefficient for a semiconductor wafer fabrication during ramp-up stage
Chang, Yung-Chia, (2014)