Management & Information Technology - Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
Year of publication: |
2006
|
---|---|
Authors: | Chiu, Singa Wang ; Chiu, Yuan-Shyi Peter ; Shih, Chih-Chang |
Published in: |
Journal of scientific and industrial research : JSIR. - New Delhi : Council, ISSN 0022-4456, ZDB-ID 4104080. - Vol. 65.2006, 9, p. 695-701
|
Saved in:
Saved in favorites
Similar items by person
-
A hybrid finite production rate system featuring random breakdown and rework
Chiu, Singa Wang, (2020)
-
A hybrid finite production rate system featuring random breakdown and rework
Chiu, Singa Wang, (2020)
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Chiu, Singa Wang, (2007)
- More ...