//-->
Managing constrained capacity : a simulation study
Li, Eldon Yu-zen, (2005)
Heuristic lot-sizing and sequencing rules in a multistage production-inventory system
Biggs, Joseph R., (1979)
The impact of capacity on lot sizing decisions