Mata-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time
Year of publication: |
2014
|
---|---|
Authors: | Xiong, Fuli ; Xing, Keyi |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 9 (1.5.), p. 2743-2766
|
Subject: | distributed two-stage assembly flowshop | scheduling | meta-heuristics | makespan | mean completion time | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Fließfertigung | Assembly-line production | Algorithmus | Algorithm | Evolutionärer Algorithmus | Evolutionary algorithm |
-
Tajbakhsh, Zahra, (2014)
-
Yu, Jae-Min, (2017)
-
Minimizing the total completion time in a distributed two stage assembly system with setup times
Xiong, Fuli, (2014)
- More ...
-
Minimizing the total completion time in a distributed two stage assembly system with setup times
Xiong, Fuli, (2014)
-
Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
Xiong, Fuli, (2015)
-
Xiong, Fuli, (2023)
- More ...