//-->
Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions
Hu, Xiaofeng, (2010)
A branch-and-bound algorithm to minimize the line length of a two-sided assembly line
A heuristic project scheduling approach for quick response to maritime disaster rescue
Yan, Liang, (2009)