Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach
Year of publication: |
2007
|
---|---|
Authors: | Chandrasekaran, C. ; Rajendran, Chandrasekharan ; Chetty, O.V. Krishnaiah ; Hanumanna, Donakonda |
Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 1.2007, 2, p. 152-181
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | economic lot scheduling problem | ELSP | time-varying lot sizes | sequence-independent setup times | lot sizing | sequence-dependent setup times | costs | genetic algorithms | simulated-annealing | ant colony algorithm | ACA | metaheuristics |
-
Chandrasekaran, C., (2007)
-
The economic lot scheduling problem : a content analysis
Beck, Fabian, (2020)
-
A stochastic profit-maximising economic lot scheduling problem with price optimisation
Salvietti, Luciano, (2014)
- More ...
-
Chandrasekaran, C., (2007)
-
Chandrasekaran, C., (2007)
-
Chandrasekaran, C., (2007)
- More ...