Minimising throughput loss in assembly lines due to absenteeism and turnover via work-sharing
Year of publication: |
2013
|
---|---|
Authors: | Bukchin, Yossi ; Cohen, Yuval |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 20 (15.10.), p. 6140-6151
|
Subject: | absenteeism | assembly line | work-sharing | industrial learning | throughput | Fehlzeit | Work absence | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem |
-
Absenteeism as a major cause of bottlenecks in assembly lines
Cohen, Yuval, (2012)
-
Two-stage scheduling in shelf-board production : a case study
Waldherr, Stefan, (2014)
-
Roshani, Abdolreza, (2021)
- More ...
-
Optimizing a dynamic order-picking process
Bukchin, Yossi, (2012)
-
Assembly system facility design
Bukchin, Yossi, (2006)
-
A space allocation algorithm for assembly line components
Bukchin, Yossi, (2005)
- More ...