Minimising total completion time on single-machine scheduling with new integrated maintenance activities
Year of publication: |
2019
|
---|---|
Authors: | Chung, Tsui-Ping ; Xue, Zhen ; Wu, Tong ; Shih, Stephen C. |
Subject: | heuristics | maintenance | scheduling | single machine | total completion time | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Instandhaltung | Maintenance policy | Durchlaufzeit | Lead time | Theorie | Theory |
-
Miyata, Hugo Hissashi, (2023)
-
Pacheco, Joaquín, (2013)
-
Single machine total completion time scheduling problem with workload-dependent maintenance duration
Xu, Dehua, (2014)
- More ...
-
Integrating production and transportation scheduling in a two-stage supply chain
Liao, Ching-Jong, (2015)
-
Scheduling with multi-attribute setup times on two identical parallel machines
Lee, Cheng-Hsiung, (2014)
-
Shih, Stephen C., (2005)
- More ...