//-->
Batching to minimize total production time for two part types
Ching, C.Y., (1997)
Bicriterion scheduling in the two-machine flowshop
Liao, C.-J., (1997)
Minimizing the range of order completion times with multiple job classes
Liao, C.-J., (1993)