//-->
Bottleneck-focused scheduling for a hybrid flowshop
Lee, G.-C., (2004)
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
Choi, S.-W., (2005)
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
Park, M.-W., (2000)