//-->
A simulation study of demand responsive transit system design
Quadrifoglio, Luca, (2008)
Flowshop scheduling with identical jobs and uniform parallel machines
Dessouky, Maged M., (1998)
A new insertion-based construction heuristic for solving the pickup and delivery problem with time windows
Lu, Quan, (2006)