//-->
A case study on the multistage IC final testing scheduling problem with reentry
Pearn, W.L., (2004)
The Integrated Circuit Packaging Scheduling Problem (ICPSP): A Case Study
Pearn, W.L., (2005)
Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions