//-->
Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
Lee, Chung-Yee, (1993)
A concise survey of scheduling with time-dependent processing times
Cheng, T. C. E., (2004)
Scheduling with centralized and decentralized batching policies in concurrent open shops
Lin, B. M. T., (2011)