Minimizing total completion time on non-identical parallel batch machines with arbitrary release times using ant colony optimization
Year of publication: |
2023
|
---|---|
Authors: | Zhang, Han ; Li, Kai ; Jia, Zhao-hong ; Chu, Chengbin |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 309.2023, 3 (16.9.), p. 1024-1046
|
Subject: | Ant colony optimization | Non-identical capacities | Parallel batch machines | Scheduling | Total completion time | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Heuristik | Heuristics | Durchlaufzeit | Lead time | Algorithmus | Algorithm |
-
Total completion time with markespan constraint in no-wait flowshops with setup times
Allahverdi, Ali, (2014)
-
On the exact bounds of SPT for scheduling on parallel machines with availability constraints
Tan, Zhiyi, (2013)
-
Ideal schedules in parallel machine settings
Jiang, Xiaojuan, (2021)
- More ...
-
Zhang, Han, (2022)
-
Zhang, Han, (2020)
-
Chen, Jianfu, (2024)
- More ...