//-->
A heuristic for single machine common due date assignment problem with different earliness/tardiness weights
Arik, Oğuzhan Ahmet, (2023)
Total completion time with markespan constraint in no-wait flowshops with setup times
Allahverdi, Ali, (2014)
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
An, Young-Jin, (2016)
Minimizing total tardiness on a two-machine re-entrant flowshop
Choi, Seong-Woo, (2009)
Minimizing makespan on an m-machine re-entrant flowshop
Choi, Seong-Woo, (2008)