//-->
A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
Zhu, Jin, (2000)
Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
Ding, Fong-Yuen, (2006)
Heuristics for scheduling flexible flow lines
Ding, Fong-Yuen, (1994)