More MILP models for hybrid flow shop scheduling problem and its extended problems
Year of publication: |
2020
|
---|---|
Authors: | Meng, Leilei ; Zhang, Chaoyong ; Shao, Xinyu ; Zhang, Biao ; Ren, Yaping ; Lin, Wenwen |
Subject: | mixed integer linear programming | blocking | hybrid flow shop scheduling | no-wait | sequence-dependent setup times | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Mathematische Optimierung | Mathematical programming |
-
Meng, Leilei, (2019)
-
Pargar, F., (2012)
-
A particle swarm optimisation for the no-wait flow shop problem with due date constraints
Samarghandi, Hamed, (2015)
- More ...
-
Meng, Leilei, (2019)
-
Ren, Yaping, (2017)
-
A fuzzy correlation based heuristic for dual-mode integrated location routing problem
Lv, Chang, (2022)
- More ...