//-->
Technical Notes - Lower bounding schemes for flowshops with blocking in-process
Ronconi, D.P., (2001)
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times
Clark, A.R., (1995)
A partial enumeration heuristic for multi-objective flowshop scheduling problems
Arroyo, J.E.C., (2004)