Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
Year of publication: |
July-September 2016
|
---|---|
Authors: | Rohaninejad, Mohammad ; Sahreian, Rashed ; Vahedi Nouri, Behdin |
Published in: |
RAIRO / Operations research. - Les Ulis : EDP Sciences, ISSN 0399-0559, ZDB-ID 1481534-5. - Vol. 50.2016, 3, p. 587-609
|
Subject: | lot-sizing | scheduling | flexible job shop | genetic algorithm | particle swarm optimization algorithm | TOPSIS | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm | Produktionssteuerung | Production control | Losgröße | Lot size | Theorie | Theory | Algorithmus | Algorithm | Ganzzahlige Optimierung | Integer programming | Produktionsplanung | Production planning | Flexibles Fertigungssystem | Flexible manufacturing system | Heuristik | Heuristics |
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Larroche, François, (2022)
-
Single-machine capacitated lot-sizing and scheduling with delivery dates and quantities
Boctor, Fayez F., (2022)
- More ...
-
Rohaninejad, Mohammad, (2017)
-
Nouri, Behdin Vahedi, (2021)
-
Rohaninejad, Mohammad, (2024)
- More ...