Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures
Year of publication: |
2013
|
---|---|
Authors: | Karimi-Nasab, M. ; Seyedhoseini, Seyed-Mohammad ; Modarres, Mohammad ; Heidari, M. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 20 (15.10.), p. 6229-6246
|
Subject: | lot sizing | scheduling | process compressibility | job shop | multi-level | Produktionssteuerung | Production control | Scheduling-Verfahren | Scheduling problem | Losgröße | Lot size | Theorie | Theory |
-
Karimi-Nasab, M., (2013)
-
Synchronisation of scarce resources for a parallel machine lotsizing problem
Almeder, Christian, (2011)
-
Cunha Neto, E., (2015)
- More ...
-
Karimi-Nasab, M., (2013)
-
An integrated methodology for assessment and selection of the project risk response actions
Seyedhoseini, Seyed-Mohammad, (2009)
-
Two polar concept of project risk management
Seyedhoseini, Seyed-Mohammad, (2008)
- More ...