//-->
Near-optimal solution to an employee assignment problem with seniority
Hojati, Mehran, (2010)
A greedy heuristic for shift minimization personnel task scheduling problem
Hojati, Mehran, (2018)
Bridging the gap between probabilistic and fuzzy-parameter EOQ models
Hojati, Mehran, (2004)